• Project
    Battique
  • Sector

Adding to a unique site
¬

Battique

Battique lies on a steep slope which prevented the use of retaining walls. This left a large rock exposed in the basement that we turned into feature wall. Concrete column-slab structure uses a pod system. Growthbuilt ‘over-excavated’ the slab and ran hydraulics underneath to save time on erection, shaving two weeks off the build to deliver the project on time. Other challenges included creating specialised fire management strategies due to the site’s proximity to a national park.

  • Client
    Central Element
  • Location
    Lane Cove, Sydney
  • Architect
    PBD Architects
  • Project Duration
    04.15 - 09.16